Twelve Apps, Thirty Tools and Every Step Inside Them.
Facilities Logix is organized into 12 main apps and 30 tools in six columns. Each app holds its steps as tabs, and each step is a complete tool with its own overview, instructions, methodology and reports. This page names every one, in the order they appear on the home screen. All of them share one Building Record, one vendor list and one set of financial standards, so nothing is entered twice.
Launching Early 2027 · Join the Early-Access List

The Twelve Apps Across the Top of the Home Screen
Numbered apps are done in order with a Next button on each step. The others are parallel choices your team opens as needed.
Executive Dashboard
- Portfolio: each building's condition, capital need, energy and risk side by side, ready for the board
Assets & Systems
- Site Survey: walk the building and capture each piece of equipment with photos, nameplate and condition
- Field Inbox: review what the team captured on phones and tablets and file each item to its building
- Asset Register: the permanent equipment record: install year, condition, remaining life and replacement value
- Building Systems: every system in the building with its assets, deficiencies and recurring obligations
- Criticality: rank equipment by what a failure would cost and set the emergency response for the critical ones

Asset register with install year, remaining life, condition and criticality.
Work & Maintenance
- Work Orders: log requests, assign them, track them to completion and see what is overdue
- Preventive Maintenance: set the recurring tasks for each asset and see what is due and what was missed
- Operator Rounds: daily readings and checks by the operating staff, with anything out of range turned into work
- Live Alarms: alarms and trends from building automation and monitoring systems, turned into work orders
- Inspections: build checklists for inspections and audits and record the findings
- Parts & Supplies Inventory: parts, filters, janitorial and paper supplies, chemicals, PPE and the tool crib
- Reliability: failure history by asset: mean time between failures, repeat problems and where to focus
Capital Planning
- Condition (FCA): score each system's condition and deferred maintenance; the facility condition index follows
- Capital Plan: a year-by-year replacement forecast from each asset's age, condition and cost, ranked by risk
- Funding Case: turn the plan into the funded request: priorities, phasing and what deferral costs
- Budget Request: build the capital budget line items for the request going to the board or leadership

Asset Reliability in Reliability & Failure Analytics: set the analysis period to rank your worst performers, and check the assets with repeat failures in Work Orders.
Capital Projects
- Estimate: estimate a project's cost from quantities and unit costs before it goes to bid
- Cost Library: your unit costs and assemblies, reused by every estimate
- Project Tracker: budget, commitments, spend and schedule for every active project
- Delivery & Closeout: milestones, submittals, punch list and closeout documents through handover
Finance & Budget
- Facility Economics: energy, maintenance and controls savings in one annual return, with payback, NPV and IRR
- ROI: return on a single project, before and after tax
- Financing: compare cash, loan, lease, PACE and energy-savings financing for the same project
- Rebates & Incentives: utility rebates, tax credits and grants a project qualifies for, and their status
- Operating Budget: the annual operating budget against actual spend, line by line
- Invoices & Payables: vendor bills matched to purchase orders and receipts, approvals, tenant and department invoices, price lists
- Facilities Finance: budget against actual by cost center, the approval chain, chargebacks, project spend and the GL-coded export
- In-House vs Outsource: compare doing the work with your own staff against contracting it out

Chargebacks in Facilities Finance: bill a month's costs to tenants and departments: utility shares, space and cost pools, each an invoice to the cent, never twice.
Utilities & Energy
- Bills: enter or import the monthly utility bills for each building and meter
- Analysis: energy use intensity, effective rates, demand charges, rate options and savings found in the bills
- Benchmarking & BPS: benchmarking and building performance standard compliance and penalty exposure
- Demand Response: what enrolling in a demand-response program would pay and what it asks of the building
Energy Projects
- Energy Audit: an ASHRAE Standard 211 audit: where the energy goes and the measures that cut it
- Retro-Commissioning: find and fix operating problems in existing systems, and track the savings kept
- Building Analytics: fault detection from building automation trend data, ranked by estimated annual cost
- M&V: prove the savings: baseline, adjustments and verified results

Scope & Baseline in Energy Audit (ASHRAE 211): set the audit level and the building's baseline energy cost and EUI. Savings percentages are measured against them.
Compliance & Safety
- Calendar: every recurring obligation, when it is due and the evidence that it was done
- Permits & C of O: permits, certificates of occupancy and their conditions
- Safety Program: safety programs, training requirements and incident rates
- Chemicals & SDS: chemical inventory with safety data sheets and storage limits
- Training & Licenses: staff certifications and licenses, and when each one expires
- Refrigerants: refrigerant leak rates, compliance and the plan away from phased-out refrigerants
- Accreditation: readiness for accreditation and regulatory surveys
Procurement
- Scope & RFP: write the scope and assemble the request-for-proposal package
- Received Bids: enter each bid as received so they can be compared line by line
- Evaluate Bids: level the bids to the same scope, score them and get an award recommendation
- Purchase Orders: issue and track purchase orders against approval limits

Cards in Safety & Compliance: track each person's safety certifications and when they expire.
Vendors & Contracts
- Contracts & Warranties: every service contract and equipment warranty, with renewal and expiry dates
- Agreement Review: benchmark a service agreement's frequency and coverage against what the equipment needs
- Insurance & COI: certificates of insurance, licenses and other vendor documents, and when they lapse
- Scorecard: rate each vendor's performance on the work they do for you
Documents
- Document Center: every report and record saved from the apps, by building
- Drawings & Controlled Docs: drawings, manuals and procedures with revision control

Renewal Alerts in Contract & Warranty Register: contracts and warranties ranked by the next deadline. Act on the top items, then export Word, Excel or PowerPoint.






Five Tools for the Physical Systems Beyond HVAC
These record assets, condition, remaining life, deficiencies and compliance obligations and publish them to the shared Building Systems record.
Electrical & Power
- Electrical & Power: switchgear, generators, UPS and power reliability, with the testing each needs
Plumbing & Water
- Plumbing & Water Safety: plumbing systems and the water management program
- Lead Service Lines: the lead service line inventory the federal rule requires

Piping Inventory in Plumbing, Domestic Water & Water Safety: list each domestic water piping system with its material and install year. Remaining life is figured for you and worn-out pipe is flagged.
Envelope & Site
- Envelope & Roof: roof, walls and windows: condition, leaks and remaining life
- Grounds & Site: paving, lighting, landscaping and other exterior assets
Elevators
- Elevators: elevators and escalators: inspections, certificates, downtime and modernization

Summary in Elevator & Conveyance Management: start here. Enter the number of elevators, escalators and lifts, and your inspection authority and cycle. The tiles fill in as you go.
Specialty Systems
- Medical Gas: medical gas and vacuum systems and their verification
- Laboratory: fume hoods, lab exhaust and specialty lab systems
- Kitchen: commercial kitchen equipment, hoods and grease systems

Capital Items in Laboratory & Specialty Systems: add the lab projects you will need to fund, with year and cost, then publish them to the building capital plan.



Five Tools for Heating, Cooling, Ventilation and Engineering
Two more workspaces are reached from Search: Central Plant, the whole plant in one place, and Equipment Decision, the same unit scored for repair, replacement or heat-pump conversion.
Central Plant
- Optimization: staging, resets and storage that cut plant energy
- Life-Cycle Cost: compare plant options over their full life, before and after tax
- Boiler & Steam: boiler efficiency, steam traps and heat recovery
Equipment Selection
- Repair or Replace: whether to repair or replace a rooftop or split unit, and the best replacement option
- Chillers: compare chillers on first cost, part-load energy and 20-year cost
- VRF / Mini-Split: variable refrigerant flow systems: cost, savings and refrigerant limits
- Refrigeration: walk-in coolers, freezers and low-temperature systems

Heat Recovery in Central Plant Optimization: heating you could recover from the plant, the heat-pump efficiency and the installed cost.
Retrofit Measures
- VFD: variable-frequency drives on fans and pumps
- Fan Wall: replacing a large fan with an array of smaller ones
- Cooling Tower: cooling tower fan, water and treatment savings
- Controls: controls upgrades and sequences: schedules, resets and economizers
Air Quality
- Air Quality: outdoor air required by ASHRAE 62.1, the shortfall and the cost to fix it

Proposed Fan Wall (array) in Fan Wall Retrofit: enter the array from the vendor's selection: number of fans, their efficiencies, and whether it carries a spare fan.
Engineering Calcs
- Load Calc: heating and cooling loads for a space or building
- Duct Sizing: duct sizes, velocities and duct leakage
- Pipe & Hydronics: pipe sizing, flow and pump head
- Airflow & Psychrometrics: airflow, mixed-air and psychrometric checks, and dehumidifier sizing
- Electrical Load: service size, feeders and keep-or-upgrade before adding big equipment or shore power
- Plumbing & Gas: water, drain-waste-vent and gas pipe sizes from a fixture count
- Quick Calcs: unit conversions and everyday engineering formulas

Added Load in Electrical Load & Service Sizing: the new equipment the project brings: heat pumps, dehumidifiers, EV chargers or a ship on shore power.

Plant decisions made one unit at a time miss the bigger picture, so Central Plant scores the chillers, tower and boiler together.



Five Tools for Emissions, Electrification and Resilience
ESG & Certifications
- ESG Report: Scope 1 and 2 emissions and the ESG disclosure
- Certifications: green-building certifications, ENERGY STAR and decarbonization targets
Electrification
- Electrification: converting gas heating to heat pumps: cost, savings and emissions

Summary in Sustainability & Decarbonization: enter the building profile: floor area, baseline and current emissions, ENERGY STAR score and net-zero target year. Progress is measured against them.
Embodied Carbon
- Embodied Carbon: embodied carbon of materials and Buy Clean requirements
EV Charging
- EV Charging: electric vehicle charging: capacity, cost and incentives

Materials & EPDs in Embodied Carbon & Buy Clean: enter each material with its quantity and the GWP from its EPD. The embodied carbon of the project builds from these rows.
Climate Resilience
- Climate Resilience: flood, heat, wind and wildfire exposure and the measures that reduce it

Hazard Exposure in Climate & Hazard Resilience: add each building and set its flood zone, wildfire, seismic, wind and heat exposure. Insurers and lenders already price these risks.

Summary in EV Charging: inventory, cost recovery and compliance gaps in one place. Check it, then export Word, Excel or PowerPoint.

Five Tools for Life Safety, Preparedness and Risk
Fire & Life Safety
- Fire & Life Safety: fire alarm, sprinkler, pump and egress systems with their inspection schedule
Emergency Preparedness
- Emergency Preparedness: emergency plans, drills and business continuity

Drills & Training in Emergency Preparedness & Continuity: record each drill and training with its frequency and last date. Next due and overdue status update on their own.
Insurance & Risk
- Insurance & Risk: property risk, insurance values and the findings insurers look for
OT Cybersecurity
- OT Cybersecurity: cybersecurity of the building automation and other operational systems

Insured Values (TIV) in Insurance & Risk: enter replacement, contents and business income values for each building. The tool compares them with your insured limits.
Incidents
- Incidents: record incidents, investigate root causes and track corrective actions

Corrective Actions in Incident & Investigation: track every corrective action with its owner and due date. An investigation is not finished until its actions are done.

Risk Findings in BAS / OT Cybersecurity: the devices to fix first, ranked by risk. Work the top of this list before anything else on the building network.


Five Tools for Space, Leases, Occupants and Accessibility
Security & Access
- Security & Access: access control, cameras and key management
Space & Leases
- Space & Leases: space inventory, occupancy and lease terms
- Lease Accounting: ASC 842, GASB 87 and SFFAS 54 lease schedules and journal entries

Allocation & Occupancy in Space & Lease Management: occupancy, vacancy and area per seat, with space by department. Use it to find underused space before leasing more.
Workplace
- Workplace: space utilization, moves, booking and workplace planning
Occupant Experience
- Surveys: occupant satisfaction surveys and results
- Comfort & Complaints: hot, cold and other complaints: patterns, root causes and response time

Survey Results in Occupant Experience: enter the survey setup and each question's mean score and favorable share. Satisfaction, response rate and the weakest area roll up from them.
Accessibility (ADA)
- Accessibility (ADA): accessibility barriers, their fixes and the transition plan schedule

Barrier Survey in ADA Transition Plan: pick the standard applied above, then list each barrier with its location, priority, estimated cost and target date. The removal schedule builds from this.

Lease dates and space records in different files lead to missed notices, so space and leases share one register.



Five Tools Holding Thirty-Six Facility Playbooks
Each playbook adds the assets, obligations and benchmarks of one kind of building, with a Compliance tab and an ENERGY STAR tab. Facilities Logix is configured for the kinds of buildings your organization runs; a portfolio that spans many markets gets every playbook it needs.
Healthcare & Science
- Healthcare: hospital environment of care, critical systems and the utility management plan
- Clinic & Outpatient: medical offices, surgery centers, dialysis, urgent care and veterinary
- Senior Living: independent, assisted living, memory care and skilled nursing
- Laboratory: research, clinical and R&D laboratories
- Cleanroom: cleanroom classification, monitoring, filtration and certification tracking
Education & Culture
- School District: K-12 schools by condition and utilization, with a capital and bond plan
- Child Care: child care, Head Start, pre-K and child development centers
- University: campus buildings, backlog, space utilization and capital renewal
- Student Housing: residence halls and student housing
- Museum & Library: museums, libraries and archives
- Worship: places of worship
- Fitness & Aquatic: fitness, recreation and aquatic centers

ENERGY STAR in Clinic & Outpatient: medical offices get a 1–100 ENERGY STAR score; surgery centers and clinics compare with their national median. The energy comes from your bills.
Public, Transit & Venues
- Government: city halls and civic buildings
- Courthouse: courthouses and justice centers
- Correctional: jails, prisons and detention facilities
- Public Safety: fire, police and EMS stations, 911 centers and emergency operations centers
- Military: military and federal installations
- Transit: rail and bus stations and transit hubs
- Airport: the whole airport, from the airfield to the control tower
- Ships & Vessels: reserve fleets, training ships, cutters, dredges and yard craft
- Arena & Venue: sports arenas, stadiums and assembly venues
- Convention Center: convention and exhibition centers
Commercial & Hospitality
- Office: tenants and leases, area and occupancy, expense recovery and base-building capital
- Retail: multi-site store portfolios, grocery refrigeration and rooftop unit life cycle
- Mixed-Use: residential, retail and office in one property
- Multifamily: units and turns, resident requests, habitability inspections and property capital
- Hotel: guest and back-of-house systems, compliance and furniture and equipment reserves
- Restaurant: kitchen and refrigeration systems, hood and health-code compliance
- Casino: round-the-clock systems, surveillance and food and beverage operations

ENERGY STAR in Mixed-Use: pick how the property is entered in Portfolio Manager: as one mixed-use property, or by its main use (office, multifamily or retail get a 1–100 score). The energy comes from your bills.
Industrial & Data
- Data Center: power and cooling capacity, redundancy and efficiency
- Manufacturing: plant utilities and the production cost of a utility failure
- Warehouse: dock and material-handling equipment, racking, cold chain and fire protection
- Central Utility Plant: plant equipment, the distribution loop and firm capacity against campus peak
- Water & Wastewater: drinking-water and wastewater treatment plants and pump stations
- Self-Storage: gate and access security, climate control, roofs and fire protection
- Parking: structural inspection, ventilation, restoration reserves, payment systems and EV charging

Capacity & Capital in Campus & Central Utility Plant: check firm capacity with the largest unit out of service, then list capital items with year and cost before you export.



Frequently Asked Questions
Do we have to use every app?
Are these separate modules to connect?
Does every step produce a report?
Be First When Facilities Logix Opens
Stop chasing building records across spreadsheets and binders. Join the list and we will tell you the day downloads open, with setup guides ready.
Launching early 2027 for Facilities Logix. Nothing to buy today, and no sales calls.
