

Power, Cooling and Redundancy, Measured Against the Load.
Launching Early 2027 · Join the Early-Access List
Every data hall is limited by two things: the power it can deliver and the heat it can remove, with a unit out for maintenance. Facilities Logix's data center playbook covers enterprise, colocation and edge data centers, telecom tower and equipment shelter sites, and broadcast transmitter and tower sites. It holds usable power and cooling capacity against the real load, a redundancy tier self-assessment with a single-point-of-failure register, PUE from spot readings and from interval meters, rack inlet temperatures against the envelope you follow, and the inspections each kind of site brings, from fire protection for IT rooms to Federal Communications Commission (FCC) tower lighting rules.

From the IT Room to the Top of the Tower
Each site's Compliance tab lists the obligations that apply to it from the compliance library, with the authority, citation, frequency and next due date, and the same dates as the Compliance Calendar. Rows that depend on equipment, such as a clean-agent system or a UPS, come from what the building's records show.
Fire Protection for IT Rooms (NFPA 75 and NFPA 76)
- Detection and suppression in IT equipment rooms inspected, tested and maintained at the NFPA 72, NFPA 25 and NFPA 2001 intervals
- Emergency and recovery procedures reviewed periodically, with annual review shown as common practice
- NFPA 76 covers telecommunications sites; this row carries the Confirm with your local authority chip, so your team checks what your authority enforces
Clean-Agent Suppression (NFPA 2001)
- Agent quantity and container pressure checked every six months, with the loss limits that call for a recharge
- A full inspection and test by qualified personnel every year
- The protected enclosure inspected at least every 12 months for new openings, with a door-fan retest where changes are found or cannot be ruled out

Compliance in Data Center Infrastructure & Capacity: see every inspection, test and filing that applies to this building and why. Enter the date each was last done; next-due dates match the Compliance Calendar.
Standby Power (NFPA 110)
- Weekly generator inspection
- Monthly load test
- Annual load-bank test when monthly tests run below 30 percent of nameplate
- A 4-hour test every 36 months for Level 1 emergency power supply systems
UPS and Batteries (IEEE 450 and IEEE 1188)
- Monthly general inspection: float voltage, charger output, room temperature and condition
- Quarterly cell voltages and temperatures, with internal ohmic readings for valve-regulated batteries
- An annual detailed inspection including connection resistance
- Shown as a recommended practice, not a legal mandate, unless your insurer, contract or code official adopts it

Power Capacity in Data Center Infrastructure & Capacity: enter usable capacity and current load for utility feeds, UPS, PDUs, generators and transfer switches. Utilization shows how much headroom remains.
Electrical Maintenance and Arc Flash (NFPA 70B and NFPA 70E)
- Infrared thermography of energized equipment every year, or every six months for equipment in poorer condition
- Switchgear and breaker maintenance on 12, 36 or 60-month intervals by condition
- The arc flash risk assessment reviewed at least every 5 years or after a major modification
Tower Structures (TIA-222)
- Tower maintenance and condition assessment recommended every 3 years for a guyed tower and every 5 years for a self-supporting tower
- Again after severe wind or ice storms
- Marked Confirm, because the interval is a recommendation your team should check against its own needs

Cooling Capacity in Data Center Infrastructure & Capacity: enter rated capacity and current load for CRAHs, chillers and economizers. Each stage is checked, so the weakest link shows first.
Antenna Structure Registration (47 CFR 17.4 and 17.57)
- The FCC Antenna Structure Registration (ASR) number posted at the base, perimeter fence or gate
- Construction, dismantlement, height and ownership or contact changes filed with the FCC within 5 days
Obstruction Lighting and Paint (47 CFR 17.47 to 17.50)
- Lights observed at least every 24 hours, or watched by an automatic alarm
- Light controls, indicators and alarms inspected at least every 3 months
- A top or flashing light out for more than 30 minutes reported to the Federal Aviation Administration (FAA), with an outage record kept 2 years
- Paint kept clean and visible; the rule sets no interval, so an annual check against the FAA tolerance chart is shown as a reasonable default and marked Confirm

Cooling Capacity in Data Center Infrastructure & Capacity: enter rated capacity and current load for CRAHs, chillers and economizers. Each stage is checked, so the weakest link shows first.
Gas-Insulated Equipment in California
- An annual report by June 1 for sites in California that held breakers or switchgear insulated with SF6 or another covered gas during the prior year, with records kept 5 years

Warranty Claims in Contract & Warranty Register: file a claim when covered equipment fails and track it to recovery. Every claim paid is money back on the repair budget.

Data center duties range from fuel tanks to the tower, so each site lists what applies with its due date.
The Power Train, the Cooling Plant and Every Rack
Five Kinds of Site
Pick enterprise, colocation or multi-tenant, edge or modular data center, telecom tower or equipment shelter, or broadcast transmitter or tower site. Enter the data hall, white space, design IT load and your target redundancy tier.
Learn MoreShow Less
Picking the right kind of site keeps your team from paying for inspections and filings that do not apply, and from missing the ones that do. The type sets the compliance rows and the ENERGY STAR yardstick for that site.
- Data halls are compared by PUE and can earn an ENERGY STAR score and certification
- Tower and shelter sites switch on the tower questions and benchmark as Other - Utility
- Design IT load is the figure cooling headroom is measured against
- Target tier is compared with the self-assessed tier, and any gap leads the report
Four Tower Questions
A tower site asks who holds the tower, whether it has an ASR number, whether the FAA assigned obstruction lights and whether it is painted aviation orange and white. The answers decide the tower rows. When another company holds the tower, the tower rows stay with that company.
Learn MoreShow Less
A tower owner who misses an FCC lighting or registration duty risks enforcement; a tenant who tracks the owner's duties wastes staff time. The four answers put each duty on the right party.
- Help notes that towers over 200 ft, or near an airport, usually need registration (47 CFR Part 17)
- An answer left at Not recorded yet becomes a question on the Compliance tab
- Every owned communications tower gets the TIA-222 condition assessment row
- The ASR number and answers print in the report's facility inputs

Summary in Data Center Infrastructure & Capacity: start here. Pick the facility type, then enter the data hall, white space, design IT load and tier. A tower site asks four tower questions. The capacity and efficiency snapshot fills in as you go.
Power Train
Utility feeds, UPS modules, PDUs, generators and automatic transfer switches, each with usable capacity (redundant units left out), current load and its redundancy: N, N+1, 2N or 2N+1. Any component above 80 percent is flagged.
Learn MoreShow Less
An overloaded UPS or generator is how a data hall drops its load; spotting it early protects uptime and puts capital where the constraint really is. The tab is built to give a true answer, not a flattering one.
- Enter usable capacity: for N+1 with four 500 kW modules, 1,500; for 2N, one side
- Components in series are never added together; the most-loaded one limits the site
- The Summary names that component, and the report says to relieve it before adding IT load
- Published components are graded Critical above 80 percent loaded, Fair above 65
Cooling Plant
CRAC and CRAH units, in-row and rear-door coolers, chillers and economizers, in tons or kW (converted at 3.517 kW per ton). Room cooling and the chiller plant are checked as separate stages, because they are the same cooling in series. Towers, dry coolers and economizers are listed but not counted as capacity.
Learn MoreShow Less
Adding IT load to a room that cannot carry it with a unit down risks an outage; buying cooling too soon ties up capital. The cooling test answers which one you face.
- Firm capacity per stage = installed capacity less the largest single unit (N+1 test)
- Headroom = the weaker stage's firm capacity less the design IT load
- A shortfall leads the report: add cooling before any more IT load, with the kW short
- The rack inlet study estimates what a higher setpoint would save a year

The PUE reading, its efficiency band and its history.
Rack and Device List
Import the rack and device export of a data center management program, or a spreadsheet: hall, row, rack, U position and height, make, model, serial, asset tag, power and device type. The Rack List shows each rack's devices, U used and kW. The same list imported twice adds nothing, and each device can go to the Asset Register.
Learn MoreShow Less
Retyping a rack inventory costs staff hours and invites errors. The import reads the file your team already keeps, by its column headings, in CSV or Excel.
- Common headings are recognized, such as cabinet, hostname, barcode or nameplate power
- Two devices in the same U of the same rack are named in the preview
- Power reads as watts or kW and is planning-grade, never measured load
- Devices sent to the Asset Register carry hall, row, rack and U as their location
Shelters Like Any Building
A shelter's generator, batteries and fire alarm come from its equipment records, as in any building, and bring their own inspection rows.
Learn MoreShow Less
A shelter's generator and batteries carry the site through an outage, and a missed test is found when the power fails. Because they come from the equipment records, those tests are never missed for want of a separate list.
- Leasing space on another company's tower removes only the tower rows
- The shelter keeps its own generator, battery and fire rows either way
- Each row shows why it applies, with its citation and next due date
- Dates match the Compliance Calendar, so one entry serves both

Cooling Capacity in Data Center Infrastructure & Capacity: enter rated capacity and current load for CRAHs, chillers and economizers. Each stage is checked, so the weakest link shows first.
Published to the Portfolio
Publish to Building Systems sends the capacity assets and the single points of failure into Assets & Systems, so they roll up with the rest of your buildings.
Learn MoreShow Less
Data hall risks only get funded when leadership sees them next to every other building's needs. Publishing puts them in the same lists, ranked the same way.
- Each power and cooling component posts as an asset with its utilization in the notes
- Components above 80 percent loaded post as Critical condition, above 65 as Fair
- Open single points of failure post as deficiencies; mitigated or accepted ones do not
- Publishing again replaces the earlier entries rather than duplicating them

Redundancy & Tier in Data Center Infrastructure & Capacity: check each tier requirement your site truly meets, and list single points of failure with a plan to remove each one.
Checks That Show What Would Drop the Load
Redundancy Tier Checklist
- Twelve requirements, from a dedicated IT space with basic N capacity and a backup engine-generator, through N+1 power and cooling and independent distribution paths, to concurrent maintainability, dual-powered IT equipment, 2N paths, fault tolerance, compartmentalization and continuous cooling
- Check only what the site truly meets; the self-assessed tier is the highest tier whose requirements, and all lower ones, are checked
- A planning aid only: formal tier certification comes from the organization that issues it, after its own review
Single Point of Failure Register
- Each point of failure with its system, impact, mitigation plan and status
- Open items publish to Building Systems as deficiencies

Compliance in Data Center Infrastructure & Capacity: see every inspection, test and filing that applies to this building and why. Enter the date each was last done; next-due dates match the Compliance Calendar.
Rack Inlet Temperature Rounds
- Readings typed or taken from a logger export or the building automation trend, each standing for the hours you enter
- Compared with the recommended envelope (starting 18-27 °C / 64.4-80.6 °F) and your equipment class's allowable range (starting A1, 15-32 °C / 59-89.6 °F), with the dew-point limit of the ASHRAE TC 9.9 guideline version you follow; every value can be changed, and it is a guideline, not law
- Hours outside each range and hot spots ranked; racks outside the allowable range are told to fix airflow first: blanking panels, containment and tiles
Live Monitoring
- Starting limits for data rooms (ASHRAE TC 9.9), UPS, generators (NFPA 110) and transfer switches, each one yours to change
- An alarm, or a reading out of limits long enough, becomes a numbered work order on the right asset with the readings and a trend chart
- Facilities Logix only listens and reads; it never changes a setpoint or commands a controller

Compliance in Data Center Infrastructure & Capacity: see every inspection, test and filing that applies to this building and why. Enter the date each was last done; next-due dates match the Compliance Calendar.
Compliance Dates
- Enter the date each obligation was last done; the next due date matches the Compliance Calendar

Ready for the Capacity Question and the Inspector
Capacity and Efficiency Snapshot
Design IT load, peak power utilization, room cooling utilization, PUE, cooling headroom with the largest unit out and the redundancy score, on the Summary tab.
Learn MoreShow Less
One screen answers the questions that decide spending: is there room for more load, and is the site as resilient as its target. Each figure fills in as the other tabs are completed.
- Peak utilization names the component that limits the site
- Cooling headroom is shown with the largest unit out, never on nameplate alone
- The redundancy score counts tier requirements met against the target
- The same figures lead the Word report as one plain decision line
Word, Excel, PowerPoint and Present
The whole assessment exports to Word, Excel and PowerPoint, or shows full screen with Present. The rack inlet study adds PDF, print and CSV.
Learn MoreShow Less
Capacity requests and capital asks need a document leadership will read; building one by hand takes staff hours. The Data Center Briefing writes itself from the tabs.
- Opens with the decision: relieve a component, add cooling or close a tier gap
- Key figures: peak utilization, headroom with the largest unit out, PUE band, self-assessed tier
- Tower answers and the ASR number print with the facility inputs
- Assumptions are stated: 3.517 kW per ton, the 80 percent planning limit, PUE bands

Compliance Schedule in Building Systems Overview: enter each recurring test, inspection and certification with its frequency and last date. Next due and overdue status update on their own.
ENERGY STAR Tab
Data centers get a 1-100 ENERGY STAR score based on PUE. Enter the IT energy at the UPS output, or use the PUE tab's IT power; the total energy comes from the bills. The national median PUE is 1.82. A tower site is benchmarked as Other - Utility, with no score.
Learn MoreShow Less
Every point of PUE above the median is energy paid for that never reaches the IT load, and many cities require benchmarking. The tab shows where the site stands before Portfolio Manager does.
- PUE = the bills' site energy ÷ the annual IT energy at the UPS output
- Data centers can also earn ENERGY STAR certification
- Other property types to choose: Office, Other - Technology/Science, Other - Utility
- Lists the benchmarking and performance-standard laws that apply to the building
Compliance Tab and Report
Every obligation that applies, with why it applies, its citation, frequency, last done and next due. The compliance report lists the obligation count and the overdue items.
Learn More
Redundancy & Tier in Data Center Infrastructure & Capacity: check each tier requirement your site truly meets, and list single points of failure with a plan to remove each one.

The Numbers a Data Hall Is Run By
Power
- Utilization = current load ÷ usable capacity, flagged above 80 percent
- Peak power utilization = the most-loaded single component, because components in series are never added together
Cooling
- Firm capacity per stage = installed capacity less the largest single unit
- Cooling headroom = the weaker of room and chiller-plant firm capacity, less the design IT load (1 kW of IT is about 1 kW of heat)

ENERGY STAR in Data Center Infrastructure & Capacity: data centers get a 1–100 ENERGY STAR score based on PUE. Enter the IT energy at the UPS output (or use the PUE tab's IT power); the total energy comes from the bills. A tower site is benchmarked as Other - Utility, with no score. See the national median and the laws that apply.
Efficiency
- PUE = total facility power ÷ IT power, and DCiE, its reciprocal
- Bands: below 1.2 Excellent, 1.2-1.5 Good, 1.5-2.0 Average, above 2.0 Poor
- A history log builds the annual figure, total facility kWh ÷ IT kWh over 12 months, which is the one to report
PUE by Zone from Meters
- Energy-based PUE for each data hall from interval meters: its IT meters, its own overhead, and a share of the shared overhead by IT energy
- Partial PUE without the shared part
- Months with under 90 percent of readings marked
Setpoint Headroom
- Headroom = recommended high less the hottest rack, less your safety margin
- Saving = tons × kW per ton × hours × °F raised × your saving per °F, plus the free-cooling hours gained, as a planning-grade estimate
Racks
- U used and kW per rack, planning-grade: the power figure your file gives, nameplate or budgeted, never measured load

Know Your Headroom Before Someone Asks for More
Maintenance Without Dropping Load
Running near nameplate erodes the room to take a unit out. Seeing utilization against usable capacity, component by component, shows where concurrent maintenance is still possible.
Learn MoreShow Less
An outage during maintenance costs far more than the work itself. Knowing which units can be taken out safely lets your team service equipment on schedule instead of deferring it until it fails.
- The tier checklist marks concurrent maintainability as its own requirement level
- Tier III means any unit or path can be serviced without touching the IT load
- Open single points of failure carry a mitigation plan and a status
- Above 80 percent, removing a unit pushes the rest past safe limits
Capacity Answers in Minutes
Power, cooling and rack figures in one record answer whether the next deployment fits, without rebuilding a spreadsheet.
Learn MoreShow Less
Stranded and over-committed capacity are the twin cost risks of a data hall: one wastes capital already spent, the other risks an outage. A quick, honest answer avoids both.
- The rack list totals kW per rack from your own inventory file
- Cooling headroom is checked against the design IT load with the largest unit out
- The most-loaded power component shows which limit you hit first
- The report states whether to add load, relieve a component or add cooling first

ENERGY STAR in Data Center Infrastructure & Capacity: data centers get a 1–100 ENERGY STAR score based on PUE. Enter the IT energy at the UPS output (or use the PUE tab's IT power); the total energy comes from the bills. A tower site is benchmarked as Other - Utility, with no score. See the national median and the laws that apply.
Tower Dates That Do Not Slip
Light checks, alarm inspections, outage reports and registration changes carry their own dates, so a missed filing or an unreported outage is visible before it becomes a finding.
Learn MoreShow Less
A tower light outage or late FCC filing can bring enforcement, and the evidence lives in records. Each duty carries its own rule and date, so nothing waits on memory.
- Light outages: report to the FAA if not fixed within 30 minutes
- Each outage record kept: what failed, when, the FAA notice time and the repairs
- Each row shows its citation, such as 47 CFR 17.48, and why it applies
- Next due dates match the Compliance Calendar; overdue items are counted in the report
Efficiency You Can Show
PUE logged over time and by hall shows what containment, economizing and setpoint changes actually did.
Learn MoreShow Less
At a PUE of 2.0, a site spends as much on cooling and losses as on the IT it serves. Showing what each change saved is what funds the next one.
- Log This Reading adds today's reading to the history in one step
- A total below the IT reading is flagged as a meter error, never shown as a PUE
- The rack inlet study estimates the yearly saving from raising the setpoint
- The ENERGY STAR tab compares the site with the national median PUE


Frequently Asked Questions
Is the redundancy tier checklist a tier certification?
We lease space on another company's tower. Which rows do we get?
Is the rack power figure a measured load?
Does Facilities Logix control our cooling or power equipment?
Which PUE should we report?
Be First When Facilities Logix Opens
Stop chasing building records across spreadsheets and binders. Join the list and we will tell you the day downloads open, with setup guides ready.
Launching early 2027 for Facilities Logix. Nothing to buy today, and no sales calls.
