

Find the Savings, Build the Retrofit Case, Prove the Result
Launching Early 2027 · Join the Early-Access List
Energy work is won when the customer's finance team believes the number. HVAC Logix reads the bills and the meter, builds each retrofit measure from its own inputs, develops the Energy Services Contract for a public or private customer, with the savings guaranteed or not, and comes back after the project to show the result against a weather-adjusted baseline. Every figure is a planning-grade estimate that shows its method and arithmetic.





Read What the Building Costs Before You Quote
At the first meeting, ask for at least 12 months, preferably 36 months, of utility data from every electrical, gas and water meter on the property. One odd year can mislead; three years show the pattern. The findings usually reframe the conversation before any equipment is discussed.
Utilities Analyzer
Takes 12, 24 or 36 months of bills from every electrical, gas and water meter and returns consumption and demand profiles, the effective rate, base load against weather-driven load, load factor, energy use intensity against a benchmark and a peak analysis. Electric, gas, water, sewer and fuels are covered. With three years side by side, the seasons, the rate increases and an unusual year stand out, and the effective rate anchors every savings estimate that follows.

Savings ideas without numbers do not sell, so the analyzer sizes each strategy from the building's own bills.
Bills by File
Read Bills accepts a CSV export of bills in three layouts, the ENERGY STAR Portfolio Manager meter export, or the utility's Green Button file. The bills are listed for review before they fill the building's monthly table. Nothing is estimated.

Typing bills by hand takes hours, so a bill file or PDF can be attached and read.
Utility Bills Against the Building's Own Trends
A bill says what was used, not why. Where Controls Command holds the building's BAS trends, each bill month is compared with the main-meter and gas-meter readings for the same month: billed against metered kWh, demand and therms, the variance and the likely reason, such as an estimated read, a wrong multiplier or meter drift. Then the BAS outputs for the same period show what the equipment was doing: fan, pump and chiller run time, speeds, valve and damper positions and temperatures. Equipment left running after hours, heating and cooling at the same time, and peaks set at start-up are found and priced at the building's own rates. A bill is never changed.

A wrong bill gets paid every month, so each one is checked against the building's own meter.
Opportunity Finder
A rules engine reads what is already on file for a building, including equipment ages, refrigerants, agreements and prior analyses, and lists the opportunities and risks you did not think to look for. Each finding links to the tool that acts on it, and every rule is editable.
Data Needed from the Client
An assessment built on bills and photos alone cannot say much. Every analysis app has a Data Needed button that opens the standard client data request, filtered to what that analysis needs, each item marked required or helpful with why. It asks for BAS trends covering the same months as the bills. Print it or copy it as an email, mark what came back for each building, and the report says what it could not conclude without the rest.

Opportunities hide in data you already hold, so Opportunity Finder reads the building's records for signals.

Demand charges hide inside the bill, so the demand analysis shows the peak, the load factor and what each peak costs.

Build Each Case from Its Own Inputs
Savings built from load bands, fuel figures and utility rates let the customer challenge one line instead of the whole number. For payback, life cycle and funding, use Facility Economics, ROI Analyzer, Life-Cycle Cost, Cash Flow, Capital Plan and Capital Bridge. For the plant, tower and fans, use Plant Optimizer, CHP & Storage, Cooling Tower and Fan Wall. Economics & Capital and Engineering Tools show each one.
VFD Retrofit
Estimates the savings band by band for a chiller, pump, tower fan or supply fan. The load profile can be your estimate or a measured automation-system trend imported from CSV or Excel, shown side by side. An electrical feasibility screen checks the feeder, breaker, voltage drop and harmonics.
Learn MoreShow Less
Most chillers, pumps and fans spend most of their hours at part load, which is where a drive pays. A measured case wins the meeting, and catching an electrical problem early keeps the job from losing money after award.
- The Estimated vs Measured panel shows the dollar difference between your guess and the building's trend.
- Fan and pump savings follow the static head; a throttled baseline shows the bigger savings.
- Condenser-water relief and minimum speed are inputs, so the chiller savings are not overstated.
- The feeder is checked to carry 125% of drive input current (NEC 430.122); harmonics flag an IEEE 519 study.

Drive savings depend on how the machine runs, so savings are worked out load band by load band.
Electrification
Models a heat-pump conversion against two baselines: do nothing and a like-for-like gas replacement. Energy uses a temperature-bin calculation with a temperature-dependent COP and auxiliary heat below the balance point. Carbon uses dated factors, and incentives are netted once.
Learn MoreShow Less
A heat pump that looks cheap at 47 °F can still lose money on the coldest night. Electrification answers the conversion question with the owner's real choices, so you sell projects that hold up.
- Annual energy ties back to the fuel the building actually burned.
- An optional grid-decarbonization path judges carbon on the grid the system will run on.
- Money Case: net first cost, incremental cost against each baseline, payback, NPV, IRR and lifecycle.
- The Excel cash flow carries live formulas, so the owner can change a fuel price or COP.
- Owner Word case without internal detail; a separate internal pack holds the workings.

Heat pumps are judged on operating cost, so the tool compares cost against the gas baseline.
CHP & Storage
Weighs combined heat and power and thermal storage against the plant's real load shape and utility rate, ranks the two on installed cost, payback and net present value, and generates a sequence of operations for the controls contractor.
Learn MoreShow Less
On-site generation and thermal storage live or die on the utility rate. This tool tells you which one pays before you spend engineering hours on the wrong one.
- Spark spread: whether generated power beats the grid once recovered heat is used.
- Recovered heat counts only where a simultaneous heat load exists to take it.
- Storage nets the demand-charge cut and on/off-peak spread against round-trip losses.
- Staging and resets are modeled once, in the Plant Optimizer, so savings are not counted twice.
- Every formula is written onto the Excel workbook's Methodology sheet.

Thermal storage only pays on the right utility rate, so storage economics use the on-peak rate and installed cost.
Rebate Tracker
An offline, dated library of utility, government and manufacturer incentives that your company keeps current. It matches incentives to the project, caps each one, totals them without double counting, and warns when the library is past its review date.
Learn MoreShow Less
An incentive is often the difference between a project the owner defers and one they sign. The tracker values each one correctly, so the net price you quote holds up.
- Values flat dollars, per ton, per unit, per square foot, percent of cost or tax-credit percent.
- Each incentive reads Active, Expiring Soon (within 90 days), Expired or Not Yet Effective.
- An expired or not-yet-effective incentive is shown but cannot be counted in the total.
- Each record keeps its sponsor, measures, cap, dates and source citation.
- Fills project, owner and contact from the building's Site Record.

Incentives change often, so the library keeps each program by state and utility with its date.

A VFD retrofit case built from the building's own motors, hours and rates.

Interval Data, Demand Charges and Demand Response
Demand charges bill the single highest stretch of the month. This work is done from the utility's own interval data and the rate schedule you type.
Interval Data and Your Utility Rate
- Import a Green Button XML or CSV file, or the utility's interval CSV
- Type the rate schedule: seasons, time-of-use periods, holidays, demand charges and the ratchet. The software never fills in a rate
- Cost By Period shows each calendar month's kWh by period, billed kW, demand dollars and total
- Peak Analysis lists the ten highest intervals and what holding each month at 90% of its own peak would save

Interval data is wasted without the utility rate, so time-of-use periods and demand charges are entered once.
Demand Charges
- Where The Money Goes: demand, energy and service charges by month, and the share of the bill the demand charge takes
- A Demand Limit Target you type, or Find The Best Target
- A Load Management Plan built from the building's own equipment records, with start times and a pre-cooling window
- Options Compared: load management, thermal storage, battery storage, combined heat and power and a peak-shaving generator, with payback and NPV

Demand charges are the hidden part of the bill, so their share and a load plan are shown.
Demand Response
- Each program's enrollment date, committed kW, payments and baseline rules, set to match the sponsor's own
- Verify an event interval by interval: adjusted baseline, actual kW, reduction and the estimated payment
- The Dispatch Advisor builds a pre-cool and load-shed plan with clock times and a dollar value, saved as Word for the operator
- Estimates only. The program sponsor's settlement is final
After-Hours Waste
- What a customer's building spends while it is closed: last night, the last weekend and the period, ranked by cause
- Monday Top 5 Overnight Wasters ranks the meters across your customers' buildings
- Create Work Order opens a numbered work order for a cause

Buildings waste money while closed, so after-hours use is ranked by building and cause.


Sell the Energy Deal with or Without a Savings Guarantee
ESC PRO, Energy Services Contract
Many contractors sell energy work without guaranteeing the savings, so it starts with two questions: is the job public or private, and are the savings guaranteed or not. Not guaranteed, it is an Energy Services Contract: every screen and document says the savings are estimated, and nothing is owed if they fall short. Guaranteed, it is a performance contract, and it adds the guaranteed amount, the shortfall terms, the measurement and verification plan and the yearly true-up. Guaranteed for a public customer, it is an ESPC, and it brings in that state's rules. Shared savings and energy as a service are choices too. Either way it builds from the audit scope and a utility baseline of at least 12 months, preferably 36, through the measure bundle, term and rate to a year-by-year schedule of savings and payments and a branded Word proposal. It is planning-grade for development. A performance contract needs an engineer's oversight, so plan for a licensed engineer to review the audit, the baseline and the savings before you sign.

Two answers set the deal: public or private, and the savings guaranteed or not.

Not guaranteed means estimated, so every screen and document says so.
Yearly Savings Reconciliation
Copy the contract's savings figures from ESC PRO, then savings are calculated two ways, from the bills and from the metered trends, side by side. Months that differ by more than the threshold are marked for a check, and the annual M&V report exports to Word. On a performance contract each year shows verified savings against the guarantee and any shortfall. With no guarantee, it shows measured savings against the estimate, and nothing is owed.

On a performance contract the savings must be proven, so every year is trued up against the guarantee.
Monthly Savings Statements
Every month after the project gets a statement with nothing extra typed. A register shows each month as Ready, Waiting or Issued, and year-to-date savings are set against the guarantee, or against the estimate when there is none, pro rata. Statements never show contractor cost, markup or margin.



Fix the Building, Then Show the Savings
Customers discount promised savings because nobody measures them afterward. Returning twelve months later with a documented, weather-normalized result changes the renewal conversation.
Retro-Commissioning
A findings register separates no-cost operational fixes from low-cost repairs and capital items. A trend screen flags the classic findings into the register, and each finding moves from identified to approved, implemented and verified, with the realization rate. The work converts into an ongoing commissioning agreement with its fee, term and visit cadence.

No-cost fixes get lost among capital items, so the findings register sorts them by cost.
Measurement & Verification
On the IPMVP framework, the tool fits a regression of baseline energy against degree-days, outdoor temperature or production, grades the model against ASHRAE Guideline 14, and reports avoided energy, cost and CO2 with the uncertainty. The provable savings, the lower bound, are the number to lead with.
RCx / M&V Workspace
One icon holds both tools on two tabs for the job that is both. Each tab is the whole tool, keeps its place while the other is in front, and exports its own report.
The Building's Own Trends
Retro-Commissioning and Measurement & Verification can read the trends Controls Command keeps for a building to fill annual energy, peak demand and the monthly figures with degree-days. A figure you typed is never replaced unless you tick its Replace box.

Trend data shows waste nobody reported, so classic findings are flagged from the building's own trends.

The retro-commissioning and M&V workspace, where findings become verified savings.

Performance Standards and Refrigerant Dates
Building Performance Standards Tracker
For every building on file, the tracker shows which performance standard or benchmarking law applies, the limit for each period from 2026 to 2035, the gap and the projected fine. The dated law pack covers New York City, Boston, Washington DC, Maryland, Denver, Colorado, Washington State and more. A one-page report and a file laid out for ENERGY STAR Portfolio Manager come from the same screen.
Learn MoreShow Less
A fine the owner has not seen coming is the strongest reason to approve a retrofit. The tracker puts that fine in dollars per year, so the project sells on the penalty it avoids.
- Energy comes from the building's bills, its meter trends or a study, side by side.
- Bills vs the Meter catches a bad bill before it is reported.
- Each law's table shows how its fine was worked out, such as NYC LL97 at $268 per tonne over.
- Use This Limit fills the energy study's carbon limit and penalty rate from the law.
- Each data pack is dated, and the date shows on every screen and report.
Refrigerant Phase-Down Schedule
Reads the units on the refrigerant asset register and plans keep, retrofit or replace by year against the federal HFC cap steps, with a supply risk index and the arithmetic behind each row. The plan can be sent to the Capital Plan, where nothing changes until you accept it.
Learn MoreShow Less
The HFC cap halves on Jan. 1, 2029, and high-GWP refrigerant gets harder to buy. The schedule shows which units to act on first, so capital goes where supply risk and leak costs are highest.
- Plans against the AIM Act cap: 60% through 2028, 30% from 2029, 20% from 2034, 15% from 2036.
- A unit leaking over 5% of its charge a year is acted on before its refrigerant turns Severe.
- A retrofit is offered only with a listed refrigerant, never an A2L in A1 equipment.
- Shows refrigerant bought until the action, and warns in red when the rules are over six months old.

Leak-rule duties depend on each unit's charge, so compliance status is worked out unit by unit.
Deadlines on the Calendar
Demand response events and enrollment deadlines, performance standard and benchmarking dates for each covered building, annual M&V report dates and monthly statement due dates all appear on the calendar with reminders.
Learn MoreShow Less
A missed enrollment or report date can cost a demand response payment, a fine or a contract payment. Each date lands on the calendar with reminders set ahead of it.
- Enrollment deadlines remind 30 and 7 days before and on the day, until Enrolled is ticked.
- Demand response events remind the day before and on the day.
- Performance standard dates remind 90, 30 and 7 days before; an unconfirmed building is marked so.
- Annual M&V reports stay on the calendar until Annual Report Sent is filled in.
- Monthly savings statements show until issued, by the days after month end you set.

Deadlines in different tools get missed, so every date lands on one calendar.

Refrigerant phase-down dates for each unit, so the customer hears about deadlines before they hit.


From the Energy Study to Proposals and Service
To Estimating and Proposals
- Import From Another Tool offers each analysis to the estimator and Proposal Composer, with the source and date recorded in the exports
- Send To Proposal fills the demand charge savings section for your review, and the phase-down plan offers its units and capital to the proposal
- Reports export to Word and Excel with the Methodology attached, and Present shows them full-screen in the meeting

Owners want the answer first, so one click presents it, with Word detail and an Excel workbook behind it.
To Service and Recurring Revenue
- Retro-commissioning findings become an ongoing commissioning agreement
- After-hours waste findings become numbered work orders
- Incentives matched in the Rebate Tracker are netted against project cost in the customer's numbers

Fixes drift back without a program, so findings become an ongoing commissioning agreement.

Rebates are easy to leave off the final price, so matched incentives flow through to the net project cost.

Frequently Asked Questions
Are the savings figures a guarantee?
Does HVAC Logix look up utility rates or rebates online?
What do we need from the customer to get started?
Can the tools use the building's own trend data?
Be First When HVAC Logix Opens
Stop paying people to copy numbers between programs. Join the list and we will tell you the day downloads open, with setup guides ready.
Launching early 2027 for HVAC Logix. Nothing to buy today, and no sales calls.
