Sustainability

Carbon, Certifications and Resilience, Built on Your Own Bills and Equipment.

Sustainability work is credible when it starts from real data. Facilities Logix builds emissions, certification and resilience reporting on the utility bills, equipment and capital plan your organization already keeps, so the numbers in a sustainability report match the numbers in the budget.

Launching Early 2027 · Join the Early-Access List

The ESG report: emissions, intensity and diversion
The ESG report: emissions, intensity and diversion
Five Tools

From the Emissions Report to the Flood Map

01

ESG & Certifications

Scope 1 and 2 emissions and a recurring carbon, intensity and waste-diversion report, plus green-building certifications, ENERGY STAR and a decarbonization roadmap.

Learn MoreShow Less

Emissions reports assembled by consultants each year cost fees and time. The report is built from the bills you already enter.

  • CO2e = quantity x emission factor / 1,000, every factor editable
  • Location-based Scope 2 from your EPA eGRID2023 subregion, plus an optional market-based factor
  • Bring in the building and 12 months of bills with one button
  • A solar and storage quick estimate with NPV, IRR and payback
02

Electrification

The money and carbon case for converting fossil heating and cooling to heat pumps: cost, savings and emissions.

Learn MoreShow Less

Converting to heat pumps at the wrong time can raise operating cost. The case compares converting now with a like-for-like gas replacement and with doing nothing.

  • Heat-pump efficiency against combustion, by temperature bin or degree day
  • Backup heat below the balance point included
  • Dated gas and grid emission factors, with optional grid decarbonization
  • Incentives netted against first cost, matched to the rebate library
Summary in Sustainability & Decarbonization: enter the building profile: floor area, baseline and current emissions, ENERGY STAR score and net-zero target year. Progress is measured against them.

Summary in Sustainability & Decarbonization: enter the building profile: floor area, baseline and current emissions, ENERGY STAR score and net-zero target year. Progress is measured against them.

03

Embodied Carbon

Capital-project material carbon from environmental product declarations, Buy Clean limit checks and declaration-collection compliance for public and institutional projects.

Learn MoreShow Less

Public projects can lose funding if their materials miss a carbon limit. The tool totals material carbon from product declarations and checks each limit.

  • Each material's quantity and global-warming potential from its EPD
  • Values entered in the same declared unit as the quantity
  • Carbon intensity per square foot or square meter
  • Buy Clean programs in California, federal agencies and a growing number of states
04

EV Charging

Charging you operate as an asset: station inventory, uptime, utilization and net cost including demand charges, with accessibility and EV-readiness compliance.

Learn MoreShow Less

A charger that is down is a stranded investment and a complaint. Tracking chargers as assets shows the true net cost and keeps them running.

  • Net cost = energy + demand-charge impact + O&M and network fees - revenue
  • Cost per session and per kWh
  • Uptime, level, connector and network for each station
  • Federally funded chargers need over 97 percent uptime (23 CFR 680)
Buy Clean Compliance in Embodied Carbon & Buy Clean: work the Buy Clean checklist and confirm EPDs and GWP limits for covered materials. Public projects can require both.

Buy Clean Compliance in Embodied Carbon & Buy Clean: work the Buy Clean checklist and confirm EPDs and GWP limits for covered materials. Public projects can require both.

05

Climate Resilience

Each building's exposure to flood, wildfire, seismic, wind and extreme heat, with hardening measures and prioritized findings.

Learn MoreShow Less

Hardening money spent on the wrong hazard protects nothing. Resilience findings point it where exposure and open measures meet.

  • Overall exposure scored from the hazard ratings you enter
  • Hardening measures grouped by hazard
  • Portfolio exposure by hazard on the Summary
  • Linked to continuity of operations planning
Hazard Exposure in Climate & Hazard Resilience: add each building and set its flood zone, wildfire, seismic, wind and heat exposure. Insurers and lenders already price these risks.

Hazard Exposure in Climate & Hazard Resilience: add each building and set its flood zone, wildfire, seismic, wind and heat exposure. Insurers and lenders already price these risks.

Climate and hazard exposure by building
Climate and Hazard Exposure by Building
Reporting

A Carbon Report Your Finance Team Recognizes

  1. ESG and Sustainability Reporting

    Turn energy, water and waste data into a recurring report of carbon, intensity and diversion. Because energy comes from the bills in Utilities & Energy, the report agrees with what your organization actually paid for. A solar and storage quick estimate gives a preliminary NPV, IRR and payback before you ask an installer for a design.

  2. Certifications and Roadmap

    Track green-building certifications and ENERGY STAR, lay out a decarbonization roadmap and choose from a payback-ranked measures library. Federal buildings get a Guiding Principles tab that marks each criterion met, not met, not applicable or opted out, and says whether the building meets them.

  3. Measures in Sustainability & Decarbonization: list efficiency and carbon measures with cost and yearly savings. Sort by payback to put the best returns first, then publish them.

    Measures in Sustainability & Decarbonization: list efficiency and carbon measures with cost and yearly savings. Sort by payback to put the best returns first, then publish them.

A carbon report that does not match the bills loses trust, so emissions are built from the same utility data.

A carbon report that does not match the bills loses trust, so emissions are built from the same utility data.

Decarbonization

Plan the Transition Around Equipment That Is Due Anyway

Equipment Decisions

  • Heat-Pump Conversion: the full money and carbon case for moving off fossil heating
  • Equipment Decision: the same unit scored three ways, repair, replace or convert to a heat pump
  • Refrigerant transition: a costed, multi-year plan away from phased-out refrigerants
  • Electrical Load: whether the existing service can carry heat pumps or EV chargers before you commit

Tied to the Capital Plan

  • Conversions enter the same risk-ranked capital plan as every other replacement
  • The Funding Case bundles high-return measures with necessary capital
  • Rebates & Incentives tracks the utility, government and manufacturer programs each project qualifies for
  • Measurement & Verification proves the result afterward
Added Load in Electrical Load & Service Sizing: the new equipment the project brings: heat pumps, dehumidifiers, EV chargers or a ship on shore power.

Added Load in Electrical Load & Service Sizing: the new equipment the project brings: heat pumps, dehumidifiers, EV chargers or a ship on shore power.

Heat-pump conversion: the money and carbon case
Heat-pump conversion: the money and carbon case
Performance Rules

Know the Standards and the Penalties Before They Arrive

01

Benchmarking and Performance Standards

Each building is checked against the benchmarking and building performance programs that apply to its location and size, with deadlines, targets and penalty exposure.

Learn More
02

ENERGY STAR Comparison

Every facility playbook compares the building with the national median for its property type, from its own bills.

Learn More
Benchmark & Score in Energy Benchmarking & BPS Compliance: your site EUI against the national median for this building type. Use it to see where the building stands before the official score.

Benchmark & Score in Energy Benchmarking & BPS Compliance: your site EUI against the national median for this building type. Use it to see where the building stands before the official score.

03

Green Cleaning

Parts & Supplies reports the share of cleaning spend that carries a recognized green-cleaning certification.

Learn More
04

Buy Clean

Embodied Carbon checks project materials against global-warming-potential limits where public projects require them.

Learn MoreShow Less

Missing a Buy Clean requirement can hold up payment on a public project. The check shows which materials meet their limit and which declarations are still missing.

  • Each material's GWP compared with its Buy Clean limit
  • Declarations collected per material, with the missing ones flagged
  • Totals in metric tons of CO2e
  • For public and institutional projects that require it
Materials & EPDs in Embodied Carbon & Buy Clean: enter each material with its quantity and the GWP from its EPD. The embodied carbon of the project builds from these rows.

Materials & EPDs in Embodied Carbon & Buy Clean: enter each material with its quantity and the GWP from its EPD. The embodied carbon of the project builds from these rows.

Building performance penalties arrive with little warning, so each building is checked against the rules that apply.

Building performance penalties arrive with little warning, so each building is checked against the rules that apply.

Who Uses It

Commitments Backed by Records

01

Leadership

Emissions, certification status and penalty exposure in the same portfolio view as condition and capital.

Learn MoreShow Less

Penalties under performance standards are a budget line leadership should see coming. Emissions sit beside condition and capital in one view.

  • Scope 1 and Scope 2 emissions and the change from last year
  • Carbon intensity per square foot and progress to target
  • Programs that apply to each building, with penalty exposure
  • Certification status, including federal Guiding Principles
02

Management

A decarbonization roadmap that is part of the capital plan rather than a separate wish list.

Learn MoreShow Less

A carbon plan kept apart from the capital plan rarely gets funded. Decarbonization measures are ranked by payback and carried into capital planning.

  • A decarbonization roadmap in the certifications tool
  • A measures library ranked by payback
  • Measures carried to the Funding Case beside the capital they ride with
  • Green-building certifications tracked in the same place
The Training Program: tracks for leadership, management, operations and administrators on the sample portfolio.

The Training Program: tracks for leadership, management, operations and administrators on the sample portfolio.

03

Operations

Projects that arrive with the load checks, incentives and verification already thought through.

Learn MoreShow Less

A project that overloads the electrical service or misses its rebate costs far more than expected. The checks are done before it starts.

  • Electrical Load shows whether the service can carry new chargers or equipment
  • Rebates matched and netted against cost before the payback
  • Measurement and verification proves the savings afterward
  • The upgrade budget, payback and NPV on a Capital Case tab
Totals, cost per square foot and the buildings with the most to fix, on one screen.

Totals, cost per square foot and the buildings with the most to fix, on one screen.

A decarbonization goal without a plan stays a slogan, so the roadmap ties each measure to the capital plan.

A decarbonization goal without a plan stays a slogan, so the roadmap ties each measure to the capital plan.

Questions

Frequently Asked Questions

Does Facilities Logix calculate an official ENERGY STAR score?
No. It compares your building with the national median for its type and says which side of 50 it points to. The official score comes only from the EPA's Portfolio Manager.
Are the solar and heat-pump results a design?
No. They are preliminary, planning-grade studies. An installer or engineer designs the system, and you should confirm tax credits and rebates for your project.
Where does the emissions data come from?
From the utility bills and fuel records your organization enters or imports, using published emission and energy factors that are shown in the report.
Early Access

Be First When Facilities Logix Opens

Stop chasing building records across spreadsheets and binders. Join the list and we will tell you the day downloads open, with setup guides ready.

Launching early 2027 for Facilities Logix. Nothing to buy today, and no sales calls.