A military installation and federal facilities

Built for Federal Real Property and Military Installations.

Launching Early 2027 · Join the Early-Access List

Federal and Military

Facilities Logix speaks the language of federal and defense facilities: real property reporting, condition indexing, mission dependency and the rules that come with federal ownership and federal money.

The Federal Playbook

Real Property, Installations, Purchasing and Compliance

Federal Real Property

FRPP and Federal Rules

  • Federal Real Property (FRPP) data on each building record
  • Federal agency and component, and federal occupancy relationships
  • 2020 Guiding Principles for Sustainable Federal Buildings tracking
  • The EISA Section 432 evaluation cycle and measure tracking
  • SFFAS 54 lease accounting
Learn More
The lease register in Facilities Logix with the accounting standard applied to each lease.
The lease register in Facilities Logix with the accounting standard applied to each lease.
Military Installations

Installation Programs

  • Installation types from bases and air stations to shipyards and depots
  • Service branch organizations and their maintenance systems
  • DoD Unified Facilities Criteria on the compliance tab
  • Mission dependency, anti-terrorism and force protection, and ISC risk assessments
  • BUILDER-style condition indexing and SRM capital
Learn More
Condition indexing for a military installation in Facilities Logix, by facility.
Condition indexing for a military installation in Facilities Logix, by facility.
Purchasing

Federal Acquisition Rules

  • FAR thresholds applied to purchase orders
  • 2 CFR 200 rules for federal grant funds
  • Davis-Bacon and Build America, Buy America flags
  • The stricter rule wins when funds are mixed
  • Evidence recorded on every purchase
Learn More
Purchase orders in Facilities Logix with the purchasing method and approval status.
Purchase orders in Facilities Logix with the purchasing method and approval status.
Compliance

Federal Workplace and Access

  • 29 CFR 1960 federal employee safety
  • ABA Accessibility Standards and Section 508
  • Fixed statutory deadlines on the compliance calendar
  • Ships and vessels handled as personal property
  • Reserve fleets, training ships, cutters and yard craft
Learn More
An installation's obligations in Facilities Logix with the citation and why each applies.
An installation's obligations in Facilities Logix with the citation and why each applies.
Ships and Vessels

Follow One Ship

Reserve fleet ships, training ships, cutters and yard craft are managed like buildings. Press Play and follow one from its record to the day it has to sail.

MV Fort ExampleA Sample Ready Reserve Ship
Every System AboardInterval, Criticality and Replacement Cost
Engine Room at 46 PercentOver the 45 Percent Limit, Work Order Open
56 Percent Run TimeOver Half the Time, Flagged
All Readings in RangeRectifier and Hull Potential Logs
Twice in Five YearsNever More Than Three Years Apart
Could It Sail in Five Days?Not Until One Certificate Is Renewed
Step 1 of 7

Every Ship Has Its Own Record

Hull number, program, ship manager, readiness status and days to activate, with every certificate date.

The first five questions, already answered.

Step 2 of 7

Maintained Like a Building

Propulsion, generators, HVAC, fire main and cranes each carry an interval, a criticality and a replacement cost.

One click sends them to the asset register and PM program.

Step 3 of 7

Humidity, Space by Space

Readings are checked against the Navy inactive-ship manual, and a space over its limit opens a work order.

Corrosion found while it is still cheap.

Step 4 of 7

The Machine That Cannot Keep Up

Hour meters show which unit runs more than half the time: undersized, or the ship is leaking.

The right unit in the right zone.

Step 5 of 7

Cathodic Protection on Schedule

Weekly rectifier logs and quarterly hull surveys, each checked against its range.

No survey slips past its date.

Step 6 of 7

The Next Drydocking, Worked Out

Due dates from the Coast Guard rule, with hull gauging graded good, fair or poor.

The cost lands in the capital plan early.

Step 7 of 7

What Would Stop This Ship Sailing?

The fleet readiness board answers for every ship, from an expiring certificate to a space out of limits.

Leadership knows before the call comes.

Pre-production screens with sample data. Features and names may change before release.

Security First

Offline Software for Sensitive Sites

Facilities Logix installs on your own computers and never connects to the internet in its standard setup. There is no vendor server and no outside account, which makes it a natural fit for secure facilities.

  • No internet connection required
  • Data stays on your computers and network
  • Phones and tablets sync only with your own office computer
  • Read-only to building automation systems
  • Optional cloud mode in your agency's own approved account
Building automation exposure and hardening checks in Facilities Logix.

Building automation exposure and hardening checks in Facilities Logix.

Facility Types

Go Deeper by Facility Type

Each facility type has its own page: the rules it answers to, the assets and systems it runs, real screens and answers to common questions.

Managers with a tablet in an operations room overlooking a military installation and naval port

Military and Federal

DoD Unified Facilities Criteria, explosives safety, waterfront and dry docks, Coast Guard and National Guard rows, FRPP data and 29 CFR 1960, by installation.

Engineer in hearing protection in a ship engine room above a team overlooking a harbor

Ships and Vessels

Ships kept like buildings: NSTM 050 lay-up, humidity by space, dehumidifier sizing, cathodic protection, drydock intervals, marine compliance and could it sail.

Airport terminal with a technician on a lift and managers reviewing plans beside the gates

Airports and the FAA

Built for how airports really work: the city, county or authority owns the airport and the FAA regulates it and runs much of it. Part 139 dates, who owns and maintains each NAVAID and tower system, and FAA forms and grant reports, all dated.

Early Access

One Program for Every Kind of Building

Every industry playbook runs on the same Facilities Logix core: assets, condition, capital, work, energy and compliance.

Launching early 2027 for Facilities Logix. Nothing to buy today, and no sales calls.