The Money Case for Every Project, in Terms the C-Suite Can Approve
Good projects are deferred because the number arrived as a quote, not as a case. These tools turn equipment, bills and condition into budgets, paybacks, life-cycle comparisons, capital plans and funding options under your letterhead. Every figure is planning-grade, shows its method and arithmetic, and is not tax or accounting advice.
Launching Early 2027 · Join the Early-Access List

A Defensible Number Before There Are Drawings
Budget Builder
Rough-order-of-magnitude budgets for equipment replacement, from a built-in cost database of more than 150 equipment types across 14 trades. Each line is priced low, typical and high, then a regional index, quality tier, contingency and escalation produce a budget range. The Proposal tab assembles an editable document you export to Word.

Owners want a figure before drawings, so Budget Builder starts from the project, region and quality tier.
ROI Analyzer
The fast single-equipment case: what a unit costs, what it saves and how quickly it pays back. It models run-hours from the building, shows how sensitive the payback is to that estimate, and bundles several measures on an interaction-adjusted total that shows the overstatement avoided. An After-Tax step adds NPV, IRR and discounted payback.

A unit swap needs a quick yes or no, so the ROI Analyzer shows net benefit and payback in one screen.
Budget to Business Case
Send To Economics publishes Budget Builder's capital figure so the ROI Analyzer and Facility Economics offer to load it. For one unit with a repair quote in hand, Equipment Decision on the Engineering Tools page scores repair, replace and convert together.

Incentives change the answer, so they are entered before the payback is worked out.

Budget Builder gives a defensible number before there are drawings.

Facility Economics: What the Building Costs to Own
The boardroom tool. It takes energy spend, equipment condition, climate, carbon position and capital limits and returns a report for the customer's leadership.
Express, for the First Meeting
- Nine questions: building type, floor area, ZIP, electric and gas spend, cooling and heating type and age, schedule, automation
- Returns an implied energy use intensity with a peer percentile, a savings-opportunity range and a deferred-capital exposure range
- Every figure is labeled a directional screening estimate and shown as a range
- Presentation Mode puts the result on the conference room screen

A first meeting has little data, so Express gives a directional picture from nine questions.
Find, Quantify, Fund, Prove
- Find: the equipment inventory with age, condition, repair cost and repair escalation for each asset
- Quantify: the opportunities the inventory implies, sized and valued
- Fund: funding routes, discount rate, escalation and the Act Now against Do Nothing comparison
- Prove: the customer-ready report with a one-page summary, exported under your letterhead

Opportunities need values, so Quantify sizes each one from the inventory.
Benchmark and Cost of Waiting
- Peer Comparison plots the building against peers of the same type and climate, with the dollar value of closing the gap
- The Service Agreement tab prices the maintenance agreement and shows its net present value
- The cost of waiting is shown per year and cumulatively
- A negative agreement value is treated as a signal to revisit scope or pricing

Waiting has a cost, so Act Now and Do Nothing are compared side by side.



Replace Emergencies with a Plan
Capital Plan
An equipment inventory with age, capacity and condition becomes a 15-year plan: replacements ranked by risk, the expected cost of deferring each one year by year, spend per year in escalated dollars and the level annual reserve contribution. The Portfolio tab rolls several buildings into one plan.
Learn More
Replacements done in a panic cost more, so assets are ranked by risk.
Life-Cycle Cost
Compares any number of named options, from repair and continue to full replacement or an alternative technology, ranked by equivalent annual cost so options with different service lives compare fairly. The do-nothing case is modeled as a degrading asset, not a flat cost.
Learn MoreShow Less
The option with the lowest first cost is often the most expensive to own. Life-Cycle Cost compares energy, maintenance and capital over the whole study period, so the cheapest option over time is named.
- Every option's cumulative cost curve on one chart
- The lowest-cost option named in plain language
- Utility rates and chiller selections imported from other tools, never overwritten quietly
- An After-Tax step for owners that pay income tax

First cost hides the real cost, so options are ranked by equivalent annual cost.
Equipment Performance and Remaining Life
Where a building's trends are on file in Controls Command, each unit's expected draw is fitted from its own history and compared with the last 30 days, with the yearly cost of the drift. Remaining life from age, run hours and health trend can be sent to the Capital Plan, where nothing changes until you accept it.
Learn MoreShow Less
A unit that slowly draws more power costs money every month and never trips an alarm. This compares what it should have drawn with what it did and prices the drift at the building's own rate.
- Fitted on the building's first 90 days of trends, or a start date you pick
- Compared only where conditions fall inside that baseline
- Covers chillers, fans, pumps, coils, towers, boilers, packaged units, heat pumps, VRF and more
- Shows every coefficient and the arithmetic behind every figure
- Remaining life from age, run hours and the health score trend
The Reserve Gap
On a typical multi-building campus, the reserve the buildings need is often far more than what is budgeted. Showing that gap moves the conversation from the next rooftop unit to a multi-year relationship.
Learn MoreShow Less
A reserve set by habit rather than need leaves replacements unfunded until they fail. The Capital Plan works out the full 15-year requirement and sets it beside the reserve you actually hold.
- Reserve fund starting balance and annual contribution entered against the requirement
- A Portfolio tab adds each building's 15-year plan into one combined forecast
- Cross-Building Risk ranks every asset across every building
- An Owner Report for the whole portfolio

Boards want one number for the backlog, so the institutional view shows replacement value and the condition index.

Life-cycle cost compares replacement paths over the years, not just the first price.


From "No Capital This Year" to "Which Route Fits"
Cash Flow
Shows one project four ways: cash, loan, lease and energy services agreement, with the payment, the saving and the net cash position each year. Read it for three things: is it cash-positive in year one, what happens at payoff, and the total cost over the asset's life. The same home screen icon also opens Accounting, which bills the work.

Owners ask if it pays in year one, so results show break-even and discounted payback.
Capital Bridge
Bundles the capital a building needs but that does not pay for itself, such as a chiller, boiler or compliance job, with high-return measures so the whole package is cash-positive. The Risks & Limitations tab shows the downside at 80% and 70% of projected savings. It is a self-funding structure and promises no savings.

Savings may fall short, so the bundle is tested at lower savings to show the owner's cash position.
Construction-Start Evidence
Some federal incentives depend on the date construction began. On the job's Closeout tab, a dated evidence log draws on daily logs, purchase orders, vendor bills and pay applications, with photos kept under a SHA-256 fingerprint. It documents dates only. The customer's tax advisor decides the position taken.

Needed work that does not pay back stalls, so it is bundled with measures that do.


Built to Survive a Finance Review
One Number for One Thing
The annual saving on the business case is the saving on the financing comparison and in the proposal. Import From Another Tool offers each figure to the next tool, records its source and date in the exports, and flags it if the source changes.
Learn MoreShow Less
Two different savings figures for the same project cost credibility with finance. Import From Another Tool carries one figure across instead of retyping it.
- Only same-unit figures are written: $/kWh, $/therm, $/1,000 gal, $ and kW
- You choose what to import, and every value stays editable
- The source is stamped onto the Word and Excel exports
- If the source analysis changes later, the tool flags it rather than updating quietly

Two tools quoting different numbers loses trust, so results are published once for the others to use.
Working You Can Audit
Every tool carries a Methodology section with each formula, each reference value with its source and review date, and a worked example. Excel workbooks keep inputs separate from results, and Life-Cycle Cost includes a show-your-working sheet.
Learn More
Finance teams check the math, so the show-your-working view lays out each year.
After-Tax Views, Stated Carefully
The ROI Analyzer and Life-Cycle Cost each have an After-Tax view. The arithmetic is correct on the numbers you enter. Tax treatment and lease classification belong to the customer's finance team.
Learn MoreShow Less
Tax treatment can change which project is worth doing, and a deduction is not cash. The After-Tax views show the same project before and after tax, with the difference explained.
- Depreciation, Section 179 and bonus depreciation shelter part of the savings
- A tax-exempt owner sees no tax advantage
- A deduction counts at its value times your tax rate; a rebate counts at face value
- Labeled a planning estimate, not tax advice
Present It on Screen
Present opens any report full-screen, one page at a time, with the same figures as the Word document. Change an input during the meeting and Present reopens on the same page.
Learn MoreShow Less
Rebuilding a deck after every question in a meeting wastes time. Present shows the live report, so an input changed in the room flows straight to the figures on screen.
- The same pages and figures as the Word report
- Arrow keys and space bar move page by page; Esc returns to the tool unchanged
- The next Present opens on the page you left
- Save the pages as a PowerPoint deck or a PDF

Meetings stall on printed decks, so Present opens the report one page at a time.

A finance team will test every figure, so the after-tax view shows depreciation and the tax effect beside the pre-tax numbers.

Frequently Asked Questions
Are these figures financial, tax or accounting advice?
Is a Budget Builder figure a price?
How does Cash Flow relate to Accounting?
Can a capital plan cover more than one building?
Be First When HVAC Logix Opens
Stop paying people to copy numbers between programs. Join the list and we will tell you the day downloads open, with setup guides ready.
Launching early 2027 for HVAC Logix. Nothing to buy today, and no sales calls.