A museum, place of worship and recreation center

Museums, Libraries, Houses of Worship and Recreation Centers

Launching Early 2027 · Join the Early-Access List

Education & Culture

Three kinds of community building, three very different risks: a collection that a humidity swing or a roof leak can ruin, a sanctuary that fills for a few hours and then sits empty, and a pool or ice rink with its own safety law. Each has its own playbook in Facilities Logix, and each shares the same compliance calendar, capital plan and reports.

Pool and aquatic obligations with next due and status
Pool and Aquatic Obligations with Next Due and Status
The Rules Built In

The Obligations Each Building Carries

Each playbook's Compliance tab lists the library obligations that apply, why, the citation, the frequency and the next due date, matching the Compliance Calendar. Feature rows apply only when the building has the feature.

Museums, Libraries and Archives

  • A trained crowd manager for assembly events (NFPA 101 and the IFC): at least one, plus one per 250 occupants above 250
  • A cultural resource fire protection review under NFPA 909, yearly; the library marks this row Confirm, to check with your fire authority
  • Clean-agent suppression: agent quantity and container pressure checked every six months, and the protected enclosure inspected at least every 12 months (NFPA 2001)
  • Fire alarm, sprinkler, emergency lighting and backflow rows as for every building

Houses of Worship

  • Trained crowd managers under NFPA 101 and the IFC; worship-only spaces of 500 or fewer are exempt from the NFPA 101 rule
  • The NFPA 909 cultural resource fire protection review, marked Confirm
  • Playground inspection under the CPSC Public Playground Safety Handbook and ASTM F1487 where there is a playground: monthly routine, annual comprehensive
  • Stage rigging inspection under ANSI E1.47 where there is rigging: Level 1 every year, Level 2 at least every 5 years
  • Per-event permits under the IFC for pyrotechnic special effects and for tents and temporary structures
  • A fellowship kitchen adds the kitchen hood suppression service and exhaust cleaning rows
Compliance in Worship & Religious: enter the date each item was last done: fire alarm, exit lighting, kitchen hood, boiler, security drills. Next-due and status update themselves.

Compliance in Worship & Religious: enter the date each item was last done: fire alarm, exit lighting, kitchen hood, boiler, security drills. Next-due and status update themselves.

Fitness, Recreation and Aquatic Centers

  • Pool and spa drain covers under the Virginia Graeme Baker Pool and Spa Safety Act: verified every year and replaced when the cover's listed life ends
  • Pool water chemistry under the CDC Model Aquatic Health Code: free chlorine or bromine and pH before opening, then every 2 hours with manual feed or every 4 hours with an automated controller; alkalinity weekly; calcium hardness and cyanuric acid monthly. Texas rules are carried as well (25 TAC 265.193)
  • A trained, credentialed pool operator, with the renewal date
  • The pool operating permit and health inspection, set by the local health authority; the library marks this row Confirm
  • Indoor ice rinks with combustion resurfacers: Minnesota carbon monoxide and nitrogen dioxide tests at least twice a week (Minn. R. 4620), and Massachusetts sampling at least three times a week (105 CMR 675)
  • Passenger ropeways such as ski lifts, under ANSI B77.1 and state tramway rules, marked Confirm
  • The bloodborne pathogens exposure control plan reviewed every year (29 CFR 1910.1030), and playground inspection where there is one
Compliance in Fitness, Recreation & Aquatic: enter the date each check was last done: pool chemistry, drain covers, natatorium air, lifeguard and AED certifications. Next-due and status update themselves.

Compliance in Fitness, Recreation & Aquatic: enter the date each check was last done: pool chemistry, drain covers, natatorium air, lifeguard and AED certifications. Next-due and status update themselves.

Museums and libraries carry duties most staff never see, so each obligation is listed with why it applies.

Museums and libraries carry duties most staff never see, so each obligation is listed with why it applies.

The Assets and Systems It Knows

Starting Systems and PM Cadence

Small staffs and volunteers cannot keep every system in their heads, so each playbook starts with a system list your team rates, costs and edits.

Museum, Library and Cultural

  • Types: art museum, history or science museum, public library, academic library, archive or special collections, and cultural center; collection sensitivity from general to sensitive paper and textile, high-value or accredited, and cold or special storage
  • Quarterly: precision HVAC for tight temperature and humidity, humidification and dehumidification, high-value security and access control, environmental monitoring and logging, and archival or cold storage
  • Semi-annual: chilled water plant, and roofing and envelope (a leak means loss)
  • Annual: collection fire suppression (clean-agent or pre-action), fire alarm and detection, and UV-filtered conservation lighting
  • Monthly: elevators and freight

Worship and Religious

  • Types: church, synagogue, mosque, temple, multi-faith chapel and religious campus; also has a fellowship hall and kitchen, a school or childcare wing, or multiple buildings
  • Semi-annual: HVAC for intermittent assembly loads, fellowship hall kitchen and hood, and roofing, steeple and envelope
  • Annual: heating boiler, audio, sound and livestream, fire alarm and sprinkler, emergency lighting and egress, and organ or piano
  • Quarterly: security and access control
  • Monthly: elevator or accessibility lift
Overview in Worship & Religious: start here. Fill in the facility profile: seats, floor area, energy use and replacement value drive every at-a-glance number.

Overview in Worship & Religious: start here. Fill in the facility profile: seats, floor area, energy use and replacement value drive every at-a-glance number.

Fitness, Recreation and Aquatic

  • Types: fitness or health club, community recreation center, aquatic center, YMCA or multi-use, boutique studio, ice arena, golf course or clubhouse, and parks and recreation facility; pools from none to indoor, outdoor or both
  • Choosing aquatic center tells the Compliance tab the building has a public pool or spa
  • Weekly: pool and spa mechanical and chemistry
  • Monthly: elevators
  • Quarterly: natatorium HVAC and dehumidification, sauna and steam, and cardio, strength and AV equipment
  • Semi-annual: domestic hot water for showers, locker and restroom plumbing, and roofing and envelope against natatorium corrosion
  • Annual: fire alarm and sprinkler, and building automation
Overview in Fitness, Recreation & Aquatic: start here. Fill in the facility profile: aquatics, floor area, energy use and replacement value drive every at-a-glance number.

Overview in Fitness, Recreation & Aquatic: start here. Fill in the facility profile: aquatics, floor area, energy use and replacement value drive every at-a-glance number.

Pool and fitness systems fail at the worst time without a plan, so each one starts with its maintenance cadence.

Pool and fitness systems fail at the worst time without a plan, so each one starts with its maintenance cadence.

Inspections, Rounds and Checklists

The Starting Checklists

Each playbook also starts with a checklist your team edits. Dates start blank.

Museum and Library

  • Temperature and humidity monitoring review against your conservation standard: monthly
  • Security system test and guard procedures: quarterly
  • Integrated pest management: quarterly
  • Collection emergency and disaster plan review: annual
  • Fire suppression (NFPA 2001 and NFPA 25), fire alarm (NFPA 72), elevator (ASME A17.1), ADA accessibility, backflow and boiler: annual

Worship

  • Kitchen hood and grease duct cleaning (NFPA 96): semi-annual
  • Assembly egress and capacity (IBC and NFPA 101), emergency and exit lighting, fire alarm, sprinkler, extinguishers (NFPA 10), elevator or lift, ADA review, boiler: annual
  • Childcare or school licensing where there is a wing, and a security assessment and drills: annual
Benchmarks in Worship & Religious: compare the building's energy use and key metrics, such as scheduling and assembly life safety, with the ENERGY STAR worship facility median.

Benchmarks in Worship & Religious: compare the building's energy use and key metrics, such as scheduling and assembly life safety, with the ENERGY STAR worship facility median.

Fitness and Aquatic

  • Pool and spa water chemistry log review (daily tests) and safety: monthly
  • Natatorium air quality for chloramines: quarterly
  • Drain entrapment under the federal pool safety act, fire alarm, sprinkler, ADA pool lift and accessibility, AED, first aid and lifeguard credentials, elevator, boiler and water heater, backflow, and sauna and steam room: annual

Monitoring Help

  • Live Alarms & Trends offers starting limits for pools and natatoriums (ASHRAE Handbook and the CDC Model Aquatic Health Code); you check them against your equipment
  • The Field Toolbox Dehumidifier tab sizes desiccant dehumidifiers for a closed space such as an archive
Compliance in Museum, Library & Cultural: enter the date each check was last done: temperature and humidity logs, clean-agent suppression, security tests, pest management. Next-due and status update themselves.

Compliance in Museum, Library & Cultural: enter the date each check was last done: temperature and humidity logs, clean-agent suppression, security tests, pest management. Next-due and status update themselves.

Compliance in Museum, Library & Cultural: enter the date each check was last done: temperature and humidity logs, clean-agent suppression, security tests, pest management. Next-due and status update themselves.

Compliance in Museum, Library & Cultural: enter the date each check was last done: temperature and humidity logs, clean-agent suppression, security tests, pest management. Next-due and status update themselves.

Reports and Readiness

Ready for the Health Inspector, the Fire Marshal and the Board

01

Compliance Tab

Every inspection, test and permit that applies to the building and why, with the next due date shared with the Compliance Calendar.

Learn More
02

Reports

A Facility Profile report in Word, a workbook in Excel and a deck in PowerPoint, plus Present mode for a board, vestry or parks commission.

Learn MoreShow Less

A capital request with the numbers already worked out is easier to fund before a failure forces an emergency spend.

  • Opens with the 10-year capital need, escalated at your rate (3% a year if left blank)
  • Facility Condition Index from your capital items and the insurance replacement value
  • Site energy shown as a percent above or below the median for the type
  • Charts of capital by year, deferred backlog by system and compliance status
Capital Plan in Worship & Religious: enter install years and costs for HVAC, the boiler, the roof and AV. The plan shows what comes due so you can budget ahead.

Capital Plan in Worship & Religious: enter install years and costs for HVAC, the boiler, the roof and AV. The plan shows what comes due so you can budget ahead.

03

ENERGY STAR Tab

Worship facilities get a 1-100 score and can earn certification. Museums, libraries and fitness centers compare with their national median with no U.S. score; an ice rink has no U.S. score, and a pool inside a scored property has its energy estimated and taken out before scoring.

Learn MoreShow Less

For buildings that run hard a few hours at a time, the median comparison shows whether scheduling is wasting money on empty rooms.

  • Worship certification: score of 75 or higher on 12 months, verified on site by a PE or RA
  • Cultural centers compare with the social and meeting hall median, 56.1 kBtu per square foot
  • Academic libraries and archives compare with the library median
  • Water use is tracked for every type; waste is tracked with no score
04

Capital Plan

Starting lines include precision HVAC and humidity control for collections, roof and steeple restoration and livestream systems for worship, and natatorium dehumidification and pool equipment for recreation.

Learn More
ENERGY STAR in Worship & Religious: worship facilities get a 1–100 ENERGY STAR score and can be certified. The energy comes from your bills; see how the building compares with the national median.

ENERGY STAR in Worship & Religious: worship facilities get a 1–100 ENERGY STAR score and can be certified. The energy comes from your bills; see how the building compares with the national median.

Capital Plan in Museum, Library & Cultural: enter install years and costs for HVAC, suppression and the roof. A roof leak can cost part of the collection, so plan these early.

Capital Plan in Museum, Library & Cultural: enter install years and costs for HVAC, suppression and the roof. A roof leak can cost part of the collection, so plan these early.

What It Tracks

The Yardsticks for Each Type

Museum and Library

  • Energy use intensity against the ENERGY STAR medians of about 56 kBtu per square foot for museums and about 72 for libraries
  • Environmental stability: temperature and humidity held within collection bands and logged continuously
  • Clean-agent or pre-action suppression to protect collections from water
  • Envelope integrity, because a roof leak over a collection is a loss no budget replaces

Worship

  • Energy use intensity against the ENERGY STAR worship median of about 31 kBtu per square foot
  • Scheduling: setback and optimal start on intermittent HVAC
  • Assembly life safety: occupant load, egress and emergency lighting
  • Security posture: access control and drills
Benchmarks in Fitness, Recreation & Aquatic: compare the facility's energy use and key metrics, such as pool water, air quality and hot water, with the ENERGY STAR median.

Benchmarks in Fitness, Recreation & Aquatic: compare the facility's energy use and key metrics, such as pool water, air quality and hot water, with the ENERGY STAR median.

Fitness and Aquatic

  • Energy use intensity against the ENERGY STAR recreation median of about 51 kBtu per square foot, with pools pushing higher
  • Daily chemistry logs, with chloramines and corrosion managed
  • Large, peaky hot-water demand from showers
  • Natatorium humidity control to protect the structure, equipment and roof
ENERGY STAR in Museum, Library & Cultural: museums and libraries compare with the ENERGY STAR national median (in the US they get no 1–100 score). The energy comes from your bills; see where the building stands.

ENERGY STAR in Museum, Library & Cultural: museums and libraries compare with the ENERGY STAR national median (in the US they get no 1–100 score). The energy comes from your bills; see where the building stands.

ENERGY STAR in Fitness, Recreation & Aquatic: fitness, recreation and aquatic centers compare with the ENERGY STAR national median (no 1–100 score). The energy comes from your bills; see where the building stands.

ENERGY STAR in Fitness, Recreation & Aquatic: fitness, recreation and aquatic centers compare with the ENERGY STAR national median (no 1–100 score). The energy comes from your bills; see where the building stands.

The Payoff

Protecting What Cannot Be Replaced

01

Small Teams, Fewer Binders

A volunteer-led congregation or a small museum staff keeps systems, dates and capital in one place instead of a filing cabinet.

Learn MoreShow Less

Volunteer hours and small staffs are the budget. Time not spent searching files goes back to the mission, and a vendor's report filed once is there when the insurer asks.

  • Load a worked example to see a finished record before entering your own
  • A guided tour walks each tab in plain steps
  • Save a JSON backup and reopen it on another computer
  • Publishing turns the system list into scheduled PM tasks
02

Water and Air Logs on Time

Pool chemistry, drain covers and ice rink air tests show their next due date, so a lapse shows up before a health inspector or a closure does.

Learn MoreShow Less

A lapsed chemistry log or drain cover can close a pool, and a closed pool stops membership and program income. Each record has a named proof.

  • Evidence per row: the chemistry log and the drain cover certification letter
  • Minnesota ice rink rows keep air logs, device calibration and training records 3 years
  • Pool and spa mechanical on a weekly PM, rated Critical
  • Natatorium air checked quarterly for chloramines
Overview in Museum, Library & Cultural: start here. Fill in the institution profile: collection sensitivity, floor area, energy use and replacement value drive every at-a-glance number.

Overview in Museum, Library & Cultural: start here. Fill in the institution profile: collection sensitivity, floor area, energy use and replacement value drive every at-a-glance number.

03

Collections and Congregations Protected

Suppression, humidity, security and assembly life safety are scheduled and tracked like the critical systems they are.

Learn MoreShow Less

A roof leak or humidity swing over a collection can cost more than any repair. Putting the roof and humidity plant first in the capital plan protects the contents.

  • Roofing over collections rated Critical, with a semi-annual PM
  • Starting lives: precision HVAC 20 years, humidity control 15, chilled water plant 22
  • Worship security and access control rated High, on a quarterly PM
  • Archival and cold storage rated High, on a quarterly PM
Capital Plan in Fitness, Recreation & Aquatic: enter install years and costs for pool equipment, dehumidifiers, water heaters and the roof. The plan shows what comes due and what is past due.

Capital Plan in Fitness, Recreation & Aquatic: enter install years and costs for pool equipment, dehumidifiers, water heaters and the roof. The plan shows what comes due and what is past due.

ENERGY STAR in Worship & Religious: worship facilities get a 1–100 ENERGY STAR score and can be certified. The energy comes from your bills; see how the building compares with the national median.

ENERGY STAR in Worship & Religious: worship facilities get a 1–100 ENERGY STAR score and can be certified. The energy comes from your bills; see how the building compares with the national median.

Questions

Frequently Asked Questions

Does it cover ice arenas, golf and parks buildings?
Yes. They are types inside the Fitness, Recreation & Aquatic playbook. Ice rink air testing is carried for Minnesota and Massachusetts, the states in the library today.
Are pool permits handled the same everywhere?
No. Permit terms and inspection frequency are set by your local health authority, so the library marks that row Confirm. Chemistry testing, drain covers and the operator credential follow the rules named on the row.
Can a church with a school or child care wing use this?
Yes. Pick that option on the Worship profile, and use the Child Care or School District playbook for the wing's own licensing and school rows.
Does it replace our conservator or fire protection engineer?
No. It schedules and records what they and your team do, and shows what is due.
Early Access

Be First When Facilities Logix Opens

Stop chasing building records across spreadsheets and binders. Join the list and we will tell you the day downloads open, with setup guides ready.

Launching early 2027 for Facilities Logix. Nothing to buy today, and no sales calls.